Promise Technology E610f Manual Pagina 257

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 436
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 256
Chapter 5: Management with the CLU
235
Starting Up After Shutdown
There are two methods for shutting down the subsystem. Choose one of the
following procedures:
Starting up the VTrak – Telnet Connection (page 235)
Starting up the VTrak – SSH Connection (page 235)
Starting up the VTrak – Serial Connection (page 236)
Starting up the VTrak – Telnet Connection
To start the RAID subsystem:
1. Manually turn on the power supply switches on the back of the subsystem.
2. Wait about two minutes.
3. Establish a Telnet connection to the VTrak.
See “Making a Telnet Connection” on page 157.
If you cannot log in, wait 30 seconds and try again.
4. Type menu and press Enter to open the CLU.
Starting up the VTrak – SSH Connection
To start the RAID subsystem:
1. Manually turn on the power supply switches on the back of the subsystem.
2. Wait about two minutes.
3. Establish a SSH connection to the VTrak.
See “Making a SSH Connection” on page 157.
If you cannot log in, wait 30 seconds and try again.
4. Type menu and press Enter to open the CLU.
Important
If you have a JBOD Expansion, always power on the JBOD
subsystems first. Then power on the RAID subsystem.
Important
If you have a JBOD Expansion, always power on the JBOD
subsystems first. Then power on the RAID subsystem.
Vista de pagina 256
1 2 ... 252 253 254 255 256 257 258 259 260 261 262 ... 435 436

Comentarios a estos manuales

Sin comentarios