Promise Technology VessRAID 1000i Series Manual Pagina 27

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 354
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 26
Chapter 2: VessRAID Installation
11
Figure 3. VessRAID 1830i rear view
For a description of the LEDs, see pages 24 and 25.
Installing the LCD Panel (Optional)
The LCD panel mounts to the left ear of the VessRAID enclosure.
1. Align the connector on the left bracket of the VessRAID enclosure to the
connector on the back of the LCD panel, as shown in Figure 4.
Figure 4. Align the connectors on the enclosure and the LCD panel
Cautions
The LCD panel is NOT a hot-swap device. Be sure the
VessRAID is powered down before you connect or disconnect
the LCD panel.
You must install the LCD panel before you mount the
VessRAID subsystem in a rack.
RAID Controller
Power Supply
Connector on
the LCD panel
Connector on
the enclosure
Vista de pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 353 354

Comentarios a estos manuales

Sin comentarios