211
Chapter 6: Management with the LCD Panel
This chapter covers the following topics:
Using the LCD Panel (below)
Perusing the Interface (page 212)
Managing the Network Connection (page 214)
Managing the Controller (page 216)
Managing Enclosures (page 217)
Managing Physical Drives (page 218)
Managing Disk Arrays (page 219)
Managing Spare Drives (page 228)
Using the LCD Panel
The LCD panel is optional and typically installed during VessRAID installation.
See page 11.
The LCD panel activates approximately 35 seconds after you switch on the
VessRAID’s power supply.
At first, the LCD screen displays
System is Initializing
.
When the VessRAID is fully booted and running under normal conditions, the
LCD screen displays the VessRAID model number and IP address, as shown in
Figure 1.
Figure 1. LCD default display
If the LCD panel displays Check Event, see “Chapter 9: Troubleshooting” on
page 277 for more information on diagnosing the issue.