Promise-technology VTrack M-Class M200i Manual de usuario Pagina 223

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 322
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 222
215
Chapter 6: Maintenance
Firmware Update – WebPAM PROe (page 217)
Firmware Update – CLU (page 219)
Replace Power Supply – All Models (page 220)
Replace Cooling Unit Fan – M500f/i/p (page 221)
Replace Cooling Unit Fan – M300f/i/p and M200f/i/p (page 226)
Replace Cache Battery – M500f/i/p (page 230)
Replace Cache Battery – M300f/i/p and M200f/i/p (page 233)
Replace SEP – M500f/i/p (page 235)
Replace SEP – M300f/i/p and M200f/i/p (page 236)
Replace RAID Controller – All Models (page 237)
This Chapter covers the maintenance procedures for VTrak.
The power supplies, cooling unit fans, and the cache battery are hot-swappable
field-replaceable components.
The Storage Enclosure Processor (SEP) and RAID Controller are field-
replaceable but they require you to power down the VTrak.
Figure 1. Field Replaceable Units (FRUs) on VTrak M500i (M500f/p are
similar)
iSCSI 1 iSCSI 2
IOIOI
Controller
Mgmt
Storage Enclosure
Processor (SEP)
RAID Controller
Power Supply 1 Cooling Unit 1
with Battery
Power Supply 2Cooling Unit 2
Vista de pagina 222
1 2 ... 218 219 220 221 222 223 224 225 226 227 228 ... 321 322

Comentarios a estos manuales

Sin comentarios