Chapter 5: Management with WebPAM PRO
139
To run PDM:
1. In Tree View, click the Subsystem icon.
2. From the dropdown menu on the Background Activities tab, choose Start
PDM.
3. In the next screen, choose the Source and Target physical drives.
The suspect physical drive is the Source.
The replacement physical drive is the Target.
4. Click the Start button.
Viewing Scheduled Activities
To view scheduled activities for this subsystem:
1. Click the Subsystem icon Tree View.
2. Click the Scheduler tab in Management View.
Scheduling an Activity
To set a scheduled activity for this subsystem:
1. Click the Subsystem icon Tree View.
2. From the dropdown menu on the Scheduler tab, choose Add BGA
Scheduler.
3. Click the option button of the activity you want:
Media Patrol. See “Running Media Patrol” on page 138
Redundancy Check. See “Running Redundancy Check” on page 176
Spare Check. See “Running Spare Check” on page 181
4. In the Scheduler dialog box, check the Enable This Schedule box.
5. Click the option button for the Recurrence Pattern you want:
•Daily
•Weekly
•Monthly
6. Click the Next button.
7. For a DAILY recurrence pattern, make the following setting:
Choose a Start Time for the activity, based on a 24-hour clock, from the
dropdown menus.
Type the number of days between activities, from 1 to 255, into the
Every days field.